Currently, Green Line of jaipur metro map and Orange Line of jaipur metro map are being constructed. The implementation of Stage 1 of the project (Mansarover to Chandpole having the length of about 9.25 km) including the civil works, permanent way, depot and traction and power supply, etc. are to be executed by DMRC on turnkey basis. The AFC, telecom and signalling, and rolling stock of line completed in stage 1 is to be executed on PPP basis in Stage 2 along with the complete line of Corridoor-I (Ambabari to Sitapura), the remaining part of Corridoor-II (Badi Chaupar to Chandpole). Green Line of jaipur metro map (Mansarovar - Badi Chaupar)




The First route of Jaipur metro rail will connect Mansarovar to Badi Chaupar via Civil Lines and Chandpole. In Phase 1, the metro would run from Mansarovar to Chandpole. The construction has already begin and is expected to be completed by June 30, 2013.

The Second route of Jaipur metro rail (north-south corridoor) will connect Sitapura Industrial Area in south to Ambabari in north via Ajmeri Gate and MI Road. The tracks will be elevated till Ajmeri Gate and then will go underground.

Jaipur Metro Project

Proposed work :- Proposed work of Jaipur metro rail is -  East-West Corridor of 12.067 km from Mansarovar to Badi Chopar. And South North corridor of  23.099 Km from Sita pura Industrial Area to Ambabari.

Proposed Budget :- A budget of Rs. 3149 crore was proposed for East-West corridor and Rs. 6583 Crore was proposed for South-North corridor for Jaipur metro rail.

Number of stations :- A total 31 stations will be there in Jaipur Metro rail. 11 will be in East-West corridor and 20 in South-North Corridor.